Morin Lake Waste Transfer Station

Morin Lake I.R. No. 217, SK

Size:
$1.4 Million
Delivery Method:
Completed:
2023
Client:
Lac La Ronge Indian Band. (Consultant: AECOM)

This project involved the decommissioning of an existing landfill and construction of a new solid waste transfer station for the community. The area had to be cleared and a new road was built to access the site. It features a pre-cast concrete retaining wall, granular structure build-up, and a perimeter fence with CCTV cameras and lighting. Earthwork, granular installation, and pre-cast concrete block installation was performed by Con-Tech employees.

Features:
Site clearing and grubbing of the new site location, pre-cast concrete block retaining walls for easy access to waste bins, decommissioning of an existing landfill
How can we help?

Make your concept a reality. Reach out to us today and we will show you why we are the leaders in our industry.

No items found.